
Project Overview: Premier FM, a leading broadcast station in Kano, faced challenges with the performance and efficiency of their existing 40kVA hybrid solar power system. To address these issues and enhance operational reliability, Fifth Energy Consultants Ltd was commissioned to reconfigure and optimize the system.
Capacity
Project Year

Project Overview: Hamada FM, a leading radio station based in Kaduna, required a professional evaluation of their energy consumption patterns to support future upgrades in their power infrastructure. Fifth Energy Consultants Ltd was commissioned to conduct a comprehensive Load Assessment aimed at understanding their current and projected energy demands, with the goal of optimizing their energy usage and preparing for a transition to renewable energy solutions.
Number
Project Year

Project Overview: Hamada FM, a leading radio station based in Kaduna, required a professional evaluation of their energy consumption patterns to support future upgrades in their power infrastructure. Fifth Energy Consultants Ltd was commissioned to conduct a comprehensive Load Assessment aimed at understanding their current and projected energy demands, with the goal of optimizing their energy usage and preparing for a transition to renewable energy solutions.
Capacity
Project Year
1. Nigerian Television Authority (NTA) HQ
2. D’kura Rural Community
1. Development of 100MW Solar Manufacturing Plant at Jigawa State
2. Design and Development of 1MW Hybrid Solar Mini Grid at Turawa Community, Soba LGA, Kaduna State
1. 300KVA Hybrid Solar Mini Grid
2. 80KVA Hybrid Solar System
3. 100KVA Hybrid Solar System
4. 100KVA Hybrid Solar Mini Grid
5. 20KVA Solar System




